Client Case Studies

Real-world examples of commercial solar, battery storage, and peak shaving projects across Alberta and British Columbia.

See What Your Facility Could Save

Completed commercial ground-mount solar and storage installation on an Alberta agricultural operation
Ground-mount solar and storage on a southern Alberta grain operation
62% Offset

Edmonton Warehouse Rooftop

A 150 kW rooftop array near the Yellowhead Trail corridor offset 62% of annual consumption with a 4.5-year payback.

Read the Case Study →
48% Bill Cut

Calgary Light-Industrial Facility

A 95 kW solar-plus-storage system near Barlow Trail cut monthly utility cost by roughly 48% in year one.

Read the Case Study →
20% Demand Cut

Southern Alberta Grain Operation

Demand charges were 43.7% of the annual power bill. A 15 kW / 30 kWh battery cut the annual demand line by roughly 20% and paid back its net cost in under a year.

Read the Case Study →
55% Offset

Metro Vancouver Distribution Facility

A 110 kW rooftop-plus-storage system near the Highway 1 corridor offset 55% of annual consumption.

Read the Case Study →
70% Offset

Okanagan Winery Production Facility

An 80 kW split-connection system on FortisBC territory offset 70% of annual consumption with a 4-year payback.

Read the Case Study →

Client names changed. Results vary based on individual circumstances. Prior results do not guarantee similar outcomes.

Get a free, no-obligation assessment modeled on your building's actual load.

Get Started